SCHOOLS/COLLEGES/UNIVERSITIES

SOUTHERN ILLINOIS UNIVERSITY AT CARBONDALE

Biological Sciences Building - Phase I   1995   (CDB-825-020-070)

A two story with mechanical penthouse building of approximately 81,000 square feet housing biological sciences laboratories, offices, a vivarium and related support spaces. Design Architect was Schmidt, Garden & Erikson, Inc. of Chicago.

Degree of formal involvement: Stein/Eggemeyer associated with SGE to provide local representation and construction observation. Bill Stein was actively involved throughout the construction period.


Biological Sciences Building - Phase II Annex   1995   (CDB-825-020-070)

An addition of 9,500 square feet to the Phase I project providing a lecture hall and related areas. Design Architect was Schmidt, Garden & Erikson, Inc. of Chicago.

Degree of formal involvement: Stein/Eggemeyer associated with SGE to provide local representation and construction observation. Bill Stein was actively involved throughout the construction period.


Closeout Services   1997   (CDB-825-020-070)

Since Schmidt, Garden & Erikson, Inc. declared bankruptcy prior to the completion and closeout of the above projects, Stein/Eggemeyer was retained by the Capital Development Board to assist with their finalization. Bill Stein handled all administrative tasks required to facilitate closeout.


Engineering Building - Section E   1997   (CDB-825-020-072)

A 88,000 square feet multi-level major addition to the School of Engineering building complex designed by Phillips, Swager Associates, Inc. of Peoria.

Degree of formal involvement: Stein/Eggemeyer associated with Phillips, Swager Associates, Inc. to provide observation and to assist with construction, administration and closeout.

Engineering Building - Section E
Engineering Building - Section E
Engineering Building - Section E

Replace Cooling Tower Screens/Components, Neckers Building   1997   (CDB-825-020-099)

This project involved replacement of roof top cooling tower components, piping and repair as well as removal/replacement of screening for cooling tower equipment and upgrading of structural supports with Bernhardt Structural Engineering as consultant.


Construct Electron Microscopy Building   1997   (CDB-825-020-106)

A new single story 5,200 square feet structure to house electron microscopy laboratories and support services.

Degree of formal involvement: Lead firm in association with Severns, Reid & Associates of Champaign who provided planning and design; Bill Stein was Project Architect, developed design details and prepared specifications.

Construct Electron Microscopy Building
Construct Electron Microscopy Building
Construct Electron Microscopy Building

University Hall Asbestos Abatement   2004

Asbestos abatement of existing building to be renovated to campus housing.


ADA Upgrades   2005   (CDB-825-020-508)

This project involved renovations to existing campus and agriculture buildings to provide accessible entrances and toilet facilites.


Demolition of University Housing Residence Halls: Allen Hall, Boomer Hall, and Wright Hall   2012

Work consisted of the demolition of three four-story with full basement residence halls of approximately 84,000 gross square feet each.  The project included removal of asbestos containing materials, disconnection of utilities, and resoration of the site.


Cool Kitchens at Lentz Hall   2012

This project consisted of the demolition of existing kitchen components; installation of new ceilings, soffits, and chases; duct access catwalk; structural framing; air handling equipment; exhaust fans; coils; low pressure ductwork; welded carbon steel hood exhaust ductwork; temperature controls; kitchen hood; steam and condensate piping; chilled water piping; lighting; electrical equipment; and wiring circuitry.