CURRENT PROJECTS

Clay County Housing Authority
Office Renovation and Site Improvements

Housing and Urban Development (HUD)

Flora and Louisville, IL

Project IL-65-1/Flora

PHA Office Renovation:

Work consists of partition revisions, wall and ceiling finishes/repairs, abatement of flooring, new flooring and base trim in designated areas, cabinetry, interior doors and windows, exterior windows, brick veneer infills, HVAC modifications, electrical revisions and devices, interior lighting, and plumbing modifications.

Maintenance Building Renovation:

Work consists of replacing existing siding on the entire building, new window at the office, paint the interior of designated areas and provide a new HVAC system for the breakroom and toilet area and work bays, and electrical revisions.  Install additional gravel parking and remove two trees at the new parking location.

Project IL-65-2/Louisville

Remove and replace sidewalks at the back of units 1101-1111.

Project IL-65-5/Flora (Montgomery Court)

Remove and replace existing sidewalks and curbs, install ADA approved curb cuts. Install additional parking areas at dwelling units.  Remove selected trees and plant new decorative trees.  Repair a small section of sewer line outside unit 707.

To see the Invitation for Bids, click here

Copies of the documents are available (two sets maximum) and may be obtained from our office by depositing a check in the amount of $75.00 for each set of documents made payable to the Clay County Housing Authority.

This project has a construction estimate of: under $220,000

Digital copies of the bid documents may be obtained from our website, click here.

Tue, 05/02/2017 - 10:00am
PHA Office - 201 South Locust St., Flora, IL
Wed, 05/24/2017 - 2:00pm
PHA Office - 201 South Locust St., Flora, IL 62839

To see the planholders list, click here

To see the prebid meeting minutes, click here


Housing Authority of Jefferson County
Site Improvements

Housing and Urban Development (HUD)

Ina, IL

Base Bid

Remove and dispose of designated concrete concrete drive and curbs, (parking areas to remain), and remove one (1) existing tree.  Place new concrete paving and curbs.  Place new concrete paving and apron connecting to Cross Street.  Install new trench drain, slot drain, and HDPE pipe storm water system.  Place new concrete dumpster pad at entrance to south parking area and relocate existing dumpster.  Regrade drainage ditch at apron along Cross Street.

By Alternate Bid

Remove and replace rear stoops and Storage Room stoops at entire site.

By Unit Prices

Remove and replace selected front concrete stoops and associated walks.  Replace existing concrete condensing unit pads.

To see the Invitation for Bids, click here

Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $50.00 for each set of documents made payable to the Housing Authority of Jefferson County.

This project has a construction estimate of: under $75,000

Digital copies of the bid documents may be obtained from our website, click here.

Tue, 05/30/2017 - 10:00am
Ina Village Hall - 306 S. Elm Street, Ina, IL 62846
Thu, 06/08/2017 - 2:00pm
PHA Office - 109 Shiloh Drive, Mt. Vernon, IL 62864

To see the planholders list, click here

Pike County Housing Authority
Window Replacement (Revised)

Housing and Urban Development (HUD)

Barry, Pittsfield, and New Canton, IL

Base Bid - Projects IL-71-10, IL-71-13, IL-71-14, and IL-71-15

Work consists of removing and replacing existing windows with new aluminum double-hung, tilt, insulated windows.  New windows shall be installed with full insect screens.  All bottom sashes in the accessible units shall have ultra-lift balances and gravity snap locks.

Base Bid - Project IL-71-1/Barry

Work consists of installing security screens and subframes on existing windows at the PHA Office.

Alternate Bid No. 1 - Project IL-71-13/Pittsfield

Work consists of removing and replacing designated doors and frames.

To see the Invitation for Bids, click here

Copies of the documents are available (two sets maximum) to General Contractors and Major Subcontractors and may be obtained from our office by depositing a check in the amount of $75.00 for each set of documents made payable to the Pike County Housing Authority.

This project has a construction estimate of: under $232,000

Digital copies of the bid documents may be obtained from our website, click here.

Thu, 06/08/2017 - 2:00pm
PHA Office - 838 Mason St., Barry, IL 62312

To see the planholders list, click here