CURRENT PROJECTS

Saline County Housing Authority
Interior Renovations/Upgrades, Phase 5 and Miscellaneous Upgrades

Housing and Urban Development (HUD)

Harrisburg, Eldorado, Galatia, and Carrier Mills, IL

Base Bid

IL-43-10/Galatia: Replacement of site sanitary sewer lines.

IL-43-145/Carrier Mills: Dwelling unit renovations including abatement of asbestos containing materials, replace underslab sewer lines, furnaces and ductwork, water supply piping, plumbing fixtures, electric devices, wiring, panels, insulation, wave and ceiling finishes, flooring and trim, cabinets, doors and hardware, treatment for termites, and other renovations.

By Alternate Bid No. 1

IL-43-3/Eldorado: Replacement of furnaces in designated units.

By Alternate Bid No. 2

IL-43-3/Eldorado: Replacement of ranges.

By Alternate Bid No. 3

IL-43-1/Harrisburg: Replacement of ranges.

To see the Invitation for Bids, click here

Copies of the documents are available to General Contractors and Major Subcontractors and may be obtained from our office by depositing a check in the amount of $125.00 for each set of documents so obtained made payable to the Saline County Housing Authority.

This project has a construction estimate of: under $430,000

Digital copies of the bid documents may be obtained from our website, click here.

Thu, 09/14/2017 - 10:00am
PHA Office - 927 W. Barnett St., Harrisburg, IL
Tue, 09/26/2017 - 2:00pm
PHA Office - 927 W. Barnett St., Harrisburg, IL 62946

To see the planholders list, click here

To see the prebid meeting minutes, click here


Housing Authority of the County of Wayne
Sidewalk Replacement

Housing and Urban Development (HUD)

Fairfield and Wayne City, IL

Project IL-88-1/Fairfield

Remove and replace existing sidewalks at various locations. Revise a section of sidewalk at the North Street Parking to eliminate a section.

Project IL-88-2/Fairfield

Remove and replace existing sidewalks along West Wood Drive and S. View Circle.

Project IL-88-3/Wayne City

Remove and replace existing sidewalks at the parking lot and install a new drive access by the West parking lot and dumpster pad for the trash service. The drive will connect to Section line road and the dumpster pad will be accessible from the west sidewalk.

Project IL-88-4/Fairfield

Remove and replace existing sidewalks at the main drive and at the alley drive.

Project IL-88-5/Fairfield

Remove and replace existing sidewalks at all sites. Remove and replace the stoop at 605A and 603B at West Water Street and N.W. Sixth Street.

To see the Invitation for Bids, click here

Copies of the documents are available (two sets maximum) and may be obtained from our office by depositing a check in the amount of $75.00 for each set of documents made payable to the Housing Authority of the County of Wayne, IL.

This project has a construction estimate of: under $65,000

Digital copies of the bid documents may be obtained from our website, click here.

Wed, 10/11/2017 - 2:00pm
303 N. First Street, Fairfield, IL 62837

To see the planholders list, click here