CURRENT PROJECTS

Housing Authority of the County of Wabash
Building Waterproofing

Housing and Urban Development (HUD)

Mt. Carmel, IL

Work consists of tuckpoint brick at designated areas.  Apply water repellent to all brick veneer. Repair, clean, and apply elastomeric coating to existing aggregate CMU panels.  Remove and replace sealants at building joints and around doors and windows.

To see the Invitation for Bids, click here

Copies of the documents are available from our office and may be obtained by depositing a check in the amount of $50 for each set of documents, made payable to the Housing Authority of the County of Wabash.

This project has a construction estimate of: under $200,000

Digital copies of the bid documents may be obtained from our website, click here.

Tue, 07/10/2018 - 10:00am
PHA Office - 330 W. Tenth St., Mt. Carmel, IL
Fri, 07/20/2018 - 2:00pm
PHA Office - 330 W. Tenth St., Mt. Carmel, IL 62863

To see the planholders list, click here

To see the prebid meeting minutes, click here


Housing Authority of the City of Marion, Illinois
Elevator Modernization

Housing and Urban Development (HUD)

Marion, IL

IL-126-1/Marion (Butler Hi-Rise) - Base Bid

Work consists of modernization of two existing hydrualic elevators including controls, motors, safety devices, cab finishes and door systems, hoist way doors and operators.  Electrical work includes replacement of designated equipment and connection of elevator No. 2 to the existing generator.  Other work items include camera system expansion and finish repairs.

IL-126-6/Marion (Lamar Hi-Rise) - Base Bid

Work consists of modernization of two existing hydrualic elevators including controls, motors, safety devices, cab finishes and door systems, hoist way doors and operators.  Other work items include hydrualic piping replacement, electrical modifications, operable mesh partitions, camera system expansion, and finish repairs.

IL-126-6/Marion (Lamar Hi-Rise) - Alternate Bid

Replace both elevator cab enclosures.

To see the Invitation for Bids, click here

Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $75.00 for each set of documents so obtained, made payable to the Housing Authority of the City of Marion, Illinois.

This project has a construction estimate of: under $850,000

Digital copies of the bid documents may be obtained from our website, click here.

Thu, 07/12/2018 - 3:00pm
PHA Office - 501 N. Market St., Marion, IL
Thu, 07/26/2018 - 2:00pm
PHA Office - 501 N. Market St., Marion, IL 62959

To see the planholders list, click here

To see the prebid meeting minutes, click here


The Housing Authority of the County of Williamson
Water Heater Replacement and Plumbing Upgrades

Housing and Urban Development (HUD)

Herrin, IL

Projects IL-50-15/Herrin  (Lymar Hi-Rise)

Work consists of removing and replacing the electric water heaters and associated piping. Removal and replacement of the second floor horizontal domestic water piping and patching and painting of wall and ceiling finishes.

To see the Invitation for Bids, click here

Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $75 for each set of documents made payable to the Housing Authority of the County of Williamson.

This project has a construction estimate of: under $150,000

Digital copies of the bid documents may be obtained from our website, click here.

Tue, 07/24/2018 - 10:00am
Lymar Hi-Rise Community Room, 301 N. 14th St., Herrin, IL 62948
Thu, 08/02/2018 - 2:00pm
Office of the Public Housing Authority, 300 Hickory, Carterville, IL 62918

To see the planholders list, click here

Edwards County Housing Authority
Site Improvements, Roof Repair, and Video Surveillance System

Housing and Urban Development (HUD)

Albion and West Salem, IL

Project IL-80-1/Albion

Work shall consist of removal of existing cupola at Community/Office Building, repairing roof deck, installing new attic ventilation, pipe boot, reinstalling existing exhaust vents and installing new underlyament and architectural shingles as necessary at repaired roof area.

Removal of block retaining wall located between Buildings D-8 and D-9 and installing new concrete retaining wall with decorative fencing and drainage piping.  Installing new stairs with railing at Unit 124 W. Walnut St. for parking lot access.  Re-grading yard areas at new retaining wall and steps as necessary for proper drainage and seeding disturbed areas.

Installation of new HD cameras and cabling at Community/Office Building and the site, complete with recording system (capable of remote access), monitors, and cabinet located in Community/Office Building.

Project IL-80-2/West Salem

Work shall consist of removal of existing cupola at Community Building, repairing roof deck, installing new attic ventilation, and installing new underlyament and architectural shingles as necessary at repaired roof area.

Installation of new HD cameras and cabling at the site, complete with recording system (capable of remote access), monitors, and cabinet located in Community Building.

To see the Invitation for Bids, click here

Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $50 for each set of documents made payable to the Edwards County Housing Authority.

This project has a construction estimate of: under $50,000

Digital copies of the bid documents may be obtained from our website, click here.

Fri, 08/03/2018 - 2:00pm
Office of the Public Housing Authority, 125 W. Cherry Street, Albion, IL 62806

To see the planholders list, click here

Pike County Housing Authority
Maintenance Building Addition

Housing and Urban Development (HUD)

Barry, IL

Work consists of demolition of concrete exterior walls of the maintenance building addition. Construct new maintenance addition which will be approximately 2,880 square feet (reuse existing concrete slab where possible). New maintenance addition shall have electrical outlets, light fixtures, and gas heat. Install new chain link fence with non-barbed wire at top around maintenance building.

To see the Invitation for Bids, click here

Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $100.00 for each set of documents, made payable to the Pike County Housing Authority.

This project has a construction estimate of: under $255,000

Digital copies of the bid documents may be obtained from our website, click here.

Tue, 08/07/2018 - 2:00pm
PHA Office - 838 Mason St., Barry, IL 62312

To see the planholders list, click here