CURRENT PROJECTS

Scott County Housing Authority
Office and Miscellaneous Renovations

Housing and Urban Development (HUD)

Winchester, IL

Office Renovations

Abate and replace existing flooring throughout building with (LVT) vinyl plank.  Reconfigure and upgrade existing work area/office.  Upgrades include relocating the entrance door to where the hall is currently.  Removal of the partition between the work area and hall.  Removal of existing entrance door to work area and reframe for new pass through window.  Reconfiguring the two existing toilets into one accessible unisex toilet.  Remove existing partitions and one storage closet in work area to open up the space.  Installing lay-in panel ceiling and new lighting in the Executive Directors office.  Replace glazing in lite between Executive Directors office and work area with insulated glazing (sound reducing).  Construct partition in current community space creating a Board room and a Break room.  Removal of the drinking fountain in the lobby area.  Reconfiguring the lay-in ceiling due to all of the partition removal.  Modifying existing electrical in work area to work with the new layout.  Upgrade the phone system.  Replace designated locksets on the interior (PHA will supply).  Add dead bolts to exterior entrance doors.  Paint interior of entire building.

New Parking

Add additional parking and access walks south of existing parking area in front of designated units.

Signage/Parking

Remove existing asphalt paving and walk at the north end of the parking area in front of the PHA office.  Install new concrete walk, concrete pad, and office signage.

Maintenenace Building

Add central air to existing HVAC system.  This shall include new condensing unit, ‘A’ coil, piping, condensing unit pad, disconnect, and modifying existing ductwork.  Coordinate the phone connections with office phone upgrades.

 

To access project documents click here.

To see the Invitation for Bids, click here

Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $75.00 for each set of documents so obtained, made payable to the Scott County Housing Authority.

This project has a construction estimate of: under $90,000


Thu, 11/08/2018 - 10:00am
PHA Office - 143 S. Walnut - P.O. Box 136, Winchester, IL
Thu, 12/06/2018 - 2:00pm
PHA Office - 143 S. Walnut - P.O. Box 136, Winchester, IL 62694

To see the planholders list, click here

To see the prebid meeting minutes, click here


Housing Authority of the County of Wayne
Roof Replacement and Site Improvements

Housing and Urban Development (HUD)

Wayne City and Fairfield, IL

IL-88-3/Wayne City

Work consists of removing and replacing existing shingle roofing system down to the wood deck.  Remove and replace drip edge, gutters, and downspouts.

IL-88-5/Fairfield

Work consists of removing and replacing existing shingle roofing system down to the wood deck.  Remove and replace drip edge, gutters, and downspouts.  Remove and replace the concrete sidewalks and stoops at designated units.

 

To access project documents click here.

To see the Invitation for Bids, click here

Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $75.00 for each set of documents so obtained, made payable to the Housing Authority of the County of Wayne.

This project has a construction estimate of: under $196,000


Tue, 11/20/2018 - 10:00am
PHA Office 303 North First Street, Fairfield, IL 62837
Wed, 12/12/2018 - 2:00pm
PHA Office 303 North First Street, Fairfield, IL 62837

To see the planholders list, click here

To see the prebid meeting minutes, click here


Housing Authority of the County of Lawrence
Kitchen Upgrades, New Maintenance Building, and Security Upgrades

Housing and Urban Development (HUD)

Lawrenceville and Bridgeport, IL

Project IL-108-1 & 5/Lawrenceville

Site improvements include a new dumpster pad with masonry enclosure on the southeast corner of the property and new parking lot on the northeast corner of the property.

Building improvements include replacement of the building access control system and replacement of the existing security camera system, including expanding areas of surveillance.

Project IL-108-2/Lawrenceville

Kitchen improvements include replacement of existing kitchen cabinets, countertops, kitchen sink, faucet, water risers, shut-off valves and PVC traps.

Project IL-108-6/Lawrenceville

Building improvements include replacement of the building access control system and security camera system, including expanding areas of surveillance.

Project IL-108-7/Bridgeport

Building improvements include installation of new building alarm system.

New Maintenance Facility

Work consists of demolition of existing building and site construction.

Construct new approximately 1,500 sf single-story facility, including but not limited to site work, concrete foundations, slabs-on-grade, wood framed structure, metal roofing, masonry and metal siding, interior metal stud partitions, interior finishes, plumbing, ventilation, and electrical systems.

 

To access project documents click here.

To see the Invitation for Bids, click here

Copies of the documents are available (2 set maximum) and may be obtained from our office by depositing a check in the amount of $125.00 for each set of documents so obtained, made payable to the Housing Authoriyt of the County of Lawrence, Illinois.

This project has a construction estimate of: under $700,000


Tue, 11/27/2018 - 10:00am
PHA Office - 1109 Twelfth Street, Lawrenceville, IL
Thu, 12/20/2018 - 2:00pm
PHA Office - 1109 Twelfth Street, Lawrenceville, IL 62439

To see the planholders list, click here

To see the prebid meeting minutes, click here


Housing Authority of the County of Clark
Windows and Siding Replacement

Housing and Urban Development (HUD)

Westfield and Marshall, IL

Project IL-69-2/Westfield - Sites 'A' and 'B'

Work shall include removing and replacing existing windows with new vinyl windows.

Project IL-69-4/Marshall - Site 'A'

Work shall include removing and replacing existing windows with new vinyl windows at all dwelling units, PHA Office, and the Maintenance Building.  Remove and replace existing vinyl siding, flashing, and trim at the PHA Office.

To access project documents click here.

To see the Invitation for Bids, click here

Copies of the documents are available and may be obtained from our office by depositing a check in the amount of $50.00 for each set of documents so obtained, made payable to the Housing Authority of the County of Clark.

This project has a construction estimate of: under $140,000


Tue, 01/08/2019 - 10:00am
PHA Office - 208 Maple St., Marshall, IL
Thu, 01/17/2019 - 2:00pm
PHA Office - 208 Maple St. - P.O. Box 282, Marshall, IL 62441

To see the planholders list, click here